Earthing calculations have a reputation for being black magic, mostly because most sheets give you one number with no derivation. The underlying formulas are old, published and checkable. Here are the three calculations every electrical design engineer runs, with worked numbers.

For one vertical rod, the standard Sverak/Dwight formula:.

Example: rho = 100 ohm-m, rod 3 m long, 16 mm diameter:.

Sources indicate that one rod does not get you to 10 ohm in average soil. That is normal and it is why we use several.

According to recent reports, rods in parallel do not divide cleanly because their resistance areas overlap. The rule of practice:.

where eta is the utilization factor, typically 0.7-0.85 depending on spacing relative to rod length. Four of the rods above, spaced about one rod length apart (eta = 0.8):.

According to recent reports, six rods, or wider spacing, gets you under 10. The honest takeaway: the utilization factor is a typical figure - your soil test and your layout decide it. Any sheet that does not show it is hiding it.

Example: 10 kA earth fault cleared in 1 s, copper PVC-insulated conductor:.

Check against the code minimum for your installation type and never size below it.

Before any lightning protection design, you estimate how often the structure is likely to be struck:.

Example: Td = 20 (Ng = 2), building 40 x 20 m, 10 m high, surrounded by taller structures (C1 = 0.5):.

One strike per 138 years. Compare that against the tolerable frequency in your risk assessment. And note what this is: a screening. A full IEC 62305-2 risk assessment is required for the final design - any tool that tells you "protection not required" from this number alone is wrong.

Industry observers note that I got tired of black-box earthing sheets, so I built the one I use: rod and grid resistance with the utilization factor shown, conductor sizing with the k table visible and the next standard size picked, lightning screening with collection area and source columns, and a 13-item design checklist (soil test, step and touch voltage, GPR, bonding, SPD coordination) with Pending/Done status. Every result row carries its formula, its source and its verification status - and every source ships marked "Not verified" so you confirm each clause against your edition before issue.

It is $34 here: Earthing & Lightning Protection Calculation Sheet.

My other field tools (NFPA 72 battery sizing, fire alarm BOQ, CAD symbol library) are on the same store: firealarmcad.gumroad.com.

Questions and corrections welcome in the comments.

→ Read original article